CCC certification need to submit the materials and processes

In 1, to the designated certification intent application submitted, shall include the following contents:
Applicant information, the manufacturer information, such as: name, address, contact person, contact;
Factory information ( including quality system status and system certification conditions etc.);
Product name, model, specification, such as trademarks;
In addition, also need to provide product information, such as: product specification, the use of repair manuals, product assembly drawings, work ( Electrical ) diagram, circuit diagram, component layout, product safety performance inspection report, safety critical parts list etc..
If the application is the product of electrical products, need to do electromagnetic compatibility test, the need to add the following technical information provided:
( 1) the electromagnetic compatibility technology standards;
( 2). May affect the safety performance of the products change note;
( 3). The product electromagnetic compatibility performance test report (according to the models provide );
( 4). All have the demands of electromagnetic compatibility EMC critical parts list.
If the application product is already certified products, change, or has been certified products are linked in the application, the applicant shall make an explanation.
2, in principle presses models apply. Different production plant for the production of the same types of products or the same production factory at different locations of the same type product, shall apply separately.
In 3, CCC certification agencies in subcontracting laboratory review the application data, dividing the product unit, and testing based on the standard, inspection items and samples needed for the same applicant agreed, by subcontracting laboratory to CCC product testing costs.
In 4, CCC certification institution jointly with business representatives according to the production of the factory's quality system situation, determine the production of factory quality system audit days, and determine the corresponding system audit fee.
In 5, CCC certification body will send the applicant CCC product certification quotation. The quotation includes the authentication fee details, product name model, testing standard and sample quantity.
6 the applicant in the quotation signed and return later, CCC certification body to business representatives issued a mandate letter, commissioned by the business representatives and the applicant has signed a contract to the certification, the official application form. Applications include needs to send information, the applicant's responsibility and with" quality system situation questionnaire".
In 7, when the following conditions are met, namely the sample into the detection stage, CCC certification body to subcontracting laboratory tasks assigned notice, inform the lab is ready to receive the testing sample:
( 1). The applicant has filled according to the requirement of good after the signature and stamp, return the quotation, officially" application" and product certification contract;
( 2). The applicant has submitted all the requirements of the application data;
( 3). The applicant has to send sample list samples will be sent to designated locations;
( 4). The applicant according to the contract of the way to pay related costs.
When the applicant fails to timely meet the above requirements, resulting in the time delay, certification cycle growth, by the burden of responsibility.
8, all the information submitted by the applicant applied Chinese writing, foreign applicants may use english.
CCC Product Certification Center Certification Department also accept the foreign applicant product authentication request, processing procedures and requirements are the same as for domestic applicants.
| Updated:2011.12.20    Source:    Clicks:

在线客服

No01
NO 02